One summer morning, a company specializing in industrial equipment relocation received an unexpected order. The customer was the renowned company ABO valve, a manufacturer of top-notch industrial valves. Their request was clear: to move several heavy and complex Kardex machines to their newly built production hall.

How did the whole event go?

Preparations for the Move

The relocation team gathered for detailed planning. The Kardex machines, known for their size and sensitivity to transportation, required precise preparation. Each team member had a specific task—from securing the necessary equipment to assessing the route the machines would be moved along.

Technicians from ABO valve were also involved in the preparations to ensure that the machines would function correctly at the new location. The new hall was equipped with all the necessary connections, and the floors were reinforced to support the weight of these machines.

Moving Day

Early in the morning, the machines were gradually disconnected from electricity and disassembled into necessary parts. Every step was taken with the utmost care to avoid damaging the valuable equipment. Packing each part into special protective covers took the entire morning.

Once the machines were loaded onto the transport vehicles, the convoy slowly set off toward the new ABO valve hall. The route had been carefully planned to minimize the risk of vibrations and unexpected obstacles. Along the way, the team closely monitored everything to ensure that the plan was followed.

Arrival at the New Hall

After safely arriving at the location, the unloading began. The moving specialists, together with ABO valve technicians, carefully reassembled the individual parts of the machines and checked that all components were in perfect condition.

Once the machines were fully reassembled and connected, it was time to bring them to life. The technicians initiated the first test cycles. Everything went smoothly—the Kardex machines operated as reliably as they had before the move.

Task Completion

After several hours of testing, the new ABO valve hall was fully ready for production to begin. The relocation team breathed a sigh of relief. They had successfully completed one of the most challenging tasks they had ever received.

The project manager from ABO valve personally thanked the team for their precise work and the care they had taken with every detail. It was clear that thanks to such professional collaboration, ABO valve could rely on its equipment in the new environment.

The story of moving the Kardex machines for ABO valve thus became another successful project that all involved would remember as a testament to the importance of experience, careful planning, and teamwork.